Water Quality Assessment of Aydughmush Dam

Water Quality Assessment of Aydughmush Dam

Construction of Aydughmush Dam is one of the most important projects in the south of Azerbaijan Province. This dam is aimed at improving agricultural lands and industrial water, regulating, balancing and providing water needs of downstream lands, proper use of groundwater resources and its integration with surface water and tourism development. In order to planning […]

Read more
Water Quality Modelling of Kanisib Dam

Water Quality Modelling of Kanisib Dam

Kanisib Dam and Zab Transmission Canal is designed to restore Urmia Lake. A one-year quality monitoring program was performed in 7 stations monthly. All physicochemical, biological and pollution parameters of water and sediment were measured in Asarab laboratory. In the following, identification, evaluation and analysis of the effects of pollution sources were carried out in […]

Read more
Environmental Impact Assessment of Trout Cage Culture and other Species of the Caspian Sea in Mazandaran Province

Environmental Impact Assessment of Trout Cage Culture and other Species of the Caspian Sea in Mazandaran Province

Although fish cage culture in the sea have been highly considered, especially by countries which are active in the aquaculture sector in recent decades due to employment creation and its positive economic effects; because of likely impacts and threats on marine ecosystem, consequently, physico-chemical and biological parameters would change as a result of wastes, fisheries […]

Read more
EIA study  of Tourism Project of Torqabeh Gold Mine

EIA study of Tourism Project of Torqabeh Gold Mine

The Mining ecotourism project of Torqabeh is the first geotourism project in Iran, Torqabeh gold mine is located in an area of approximately 212 ha, in 8 kilometres far from of Mashhad in west, about 3 kilometers from the small town of Torqabeh. Extraction was carried out through open tunnels and through the tunnel for […]

Read more
Environmental Impact Assessment study of Parsian Port

Environmental Impact Assessment study of Parsian Port

In this study, Asarab Co. in cooperation with the Norwegian company of Akvaplan-Niva, conducted an environmental assessment of the Parsian port construction to minimize adverse impacts resulting from project construction and operation. To investigate the marine environment, a specialized diving team surveyed to investigate the corals status and marine biomass, sampled physical, chemical and biological […]

Read more
EIA study of Dorud-Khoramabad-Andimeshk Railway

EIA study of Dorud-Khoramabad-Andimeshk Railway

This railway is approximate 340 Kilometers (339.61) and will be branched out from Lorestan railway. This railway is located near Doroud-Andimeshk and Dokuheh presidio, and in the station of Dokuheh, the railway will be connected to the national railway of the south of the country. Totally, 19 stations were designed for the railway. The railway […]

Read more
Sampling and Water Quality Analysis of Alborz Dam

Sampling and Water Quality Analysis of Alborz Dam

Considering the increasing eutrophication of the Alborz Dam Reservoir and the importance of discharging water of the dam in providing drinking water to the cities of Babol, Babolsar, Amirkala, Fereydunkenar … sampling studies were conducted to determine the quality of the dam reservoir. The main objectives of this study are to determine the quality of […]

Read more
Qualitative Sampling and Limnological Study of Lake Urmia

Qualitative Sampling and Limnological Study of Lake Urmia

Since, National park Urmia is under threat to be died and depletion, in the recent years Iran Water and Power Resources Development Company has put this matter in its priority to collect sufficient and comprehensive data for next steps to restore Lake Urmia. Asarab with cooperation of Norwegian consulting company of AKVA PLAN-NIVA, has performed […]

Read more
  • 1
  • 2
  • 5