Engineering, Procurement and Construction Project of Irrigation and Drainage Networks, Land Reclamation and Levelling and Sub-Surface Drainage in Ramshir County

Engineering, Procurement and Construction Project of Irrigation and Drainage Networks, Land Reclamation and Levelling and Sub-Surface Drainage in Ramshir County

EPC project of irrigation and drainage networks, land reclamation and leveling and sub-surface drainage pipelines in Ramshir consisted of 5,600 hectares, including land leveling, sub-surface drainage, and canal construction, establishing gravity, low pressurized semi-mechanized and pressurized irrigation systems, and constructing tertiary and quad irrigation canals in the farms. In this project to overcome hurdles including […]

Read more
Study on fisheries development in Khuzestan province

Study on fisheries development in Khuzestan province

Study on fisheries development in Khuzestan Province was performed for creating provincial aquaculture development plan. The existing aquaculture and development capacity of fisheries market were assessed considering climate, social features and economic situation. The development managing programme in the province was prepared based on Planning for Commercial Aquaculture model considering environmental approach and ecological factors. […]

Read more
Environmental Impact Assessment of Trout Cage Culture and other Species of the Caspian Sea in Mazandaran Province

Environmental Impact Assessment of Trout Cage Culture and other Species of the Caspian Sea in Mazandaran Province

Although fish cage culture in the sea have been highly considered, especially by countries which are active in the aquaculture sector in recent decades due to employment creation and its positive economic effects; because of likely impacts and threats on marine ecosystem, consequently, physico-chemical and biological parameters would change as a result of wastes, fisheries […]

Read more
Environmental Impact Assessment study of Parsian Port

Environmental Impact Assessment study of Parsian Port

In this study, Asarab Co. in cooperation with the Norwegian company of Akvaplan-Niva, conducted an environmental assessment of the Parsian port construction to minimize adverse impacts resulting from project construction and operation. To investigate the marine environment, a specialized diving team surveyed to investigate the corals status and marine biomass, sampled physical, chemical and biological […]

Read more
Qualitative Sampling and Limnological Study of Lake Urmia

Qualitative Sampling and Limnological Study of Lake Urmia

Since, National park Urmia is under threat to be died and depletion, in the recent years Iran Water and Power Resources Development Company has put this matter in its priority to collect sufficient and comprehensive data for next steps to restore Lake Urmia. Asarab with cooperation of Norwegian consulting company of AKVA PLAN-NIVA, has performed […]

Read more