Key Figures

  • 30 years of experience
  • Asarab has conducted more than 400 projects
  • 328 employees
  • 70 ongoing projects
  • Study, design and supervision on construction and implementation of more than 100,000 ha irrigation & drainage networks
  • Study, design and supervision on implementation and construction of more than 300 pumping stations and water intake from canals and reservoirs (with capacity of 200 l/s to 10 m3/s)
  • Integrated study for shrimp farming in Sistan and Baluchestan and Golestan Provinces with a total area of 70,000 ha
  • Study on river training, waterbeds and flood protection with an approximate length of 1,200 km
  • Environmental studies of freeways, railways and metro lines with an approximate length of 5,000 km
  • Conducting more than 80 environmental studies on dams, ports, power plants and mines
  • Study, design and supervision on 19 projects of port construction and supporting facilities
  • Cadastral surveying and topographic mapping for more than 50 cases with an area over 100,000 ha